Projects

Our Global Projects

#Future

Track Construction and Maintenance Projects all over the world are our daily business and proficiency. The SKGroup is working with its different departments to consults and supports with its longterm experience all over the world.

Our Global Projects



Track construction, track rehabilitation and maintenance in different regions around the world are our business and proficiency. SK Group based on the experience of over 30 years of its group members provides individual and focused consulting in order to establish the best methodology to the reach target. Our consultants carefully listen to you, which goals you wish to achieve, which resources you have available and which problems and difficulties you encounter. In a dialogue with you and based on your and our experience and the available resources we develop methods, concepts and problem solving solutions for success.


East Rail, Hong Kong, China

Responsibilities:


Development of a simultaneous in line ballast replacement methodology under running traffic

Design and supply of the ballast replacement machine and necessary rolling stock for supply of new and removal of old ballast



Manila LRT Line 1, Phillippines

Responsibilities:



Development of ballast replacement method on viaducts

Design and allocation of necessary plant


LRTA -BGS JV Malaysia

Responsibilities:


Consultancy of work procedure for Track Construction Test Line

Provision of machinery fitters and operators

Training for machinery fitters and operators

Gautrain Johannesburg – Pretoria, South Africa

Responsibilities:


Allocation and supply of construction plant and rolling stock

Training of operators

Development and design of a rail/road overhead catenary maintenance vehicle


Turkey High speed line Ankara – Istanbul (Ankara – Polatli section)

Responsibilities:


Design of work trains

Work train logistics and spare part supply

Work train maintenance by SKG Maintenance personnel


ERL Airport Railway, Kuala Lumpur, Malaysia

Responsibilities:


Assistance in development of track construction methods

Specification and allocation of track construction plant

High speed line Kowloon – Shenzhen, China

Responsibilities:


Design of work trains

Supply of worktrains 

Training of operators

Work train maintenance by SKG maintenance personnel

NewZealand Tunneling Project

Responsibilities:


Consultancy Services to work out the work and project program for the maintenance and renewal operation project of a railway tunnel in New Zealand


Singapore Metro – HBGS JV/BGS JV

Responsibilities:


Participation in development and design of mechanized track panel laying method in tunnels and on viaducts

Co- development of track panel laying system “METROSTAR”

Allocation and supply of plant and rolling stock


Hong Kong Airport Railway

Responsibilities:


Adoption of METROSTAR track panel laying method 

Specification and allocation of all on track plant

Training of plant operators


High Speed line Ankara – Konya (Polatli – Konya section)

Responsibilities:


Specification and allocation of on track plant

Training of personnel


Kayseri LRT - Turkey

Responsibilities:


Design of service vehicles

Supply of depot machinery and service vehicles 

Training of personnel


Share by: